Affiliate Window

In addition to the logistical issues of moving live production equipment from Germany to London, our client also needed their new colocation site to be fully recabled. The entire site needed to be ready to go live as soon as the servers and SAN arrived. Accompanied by our client, the Computer Relocations project manager conducted Read more...


For reasons of confidentiality the name of this client has been withheld

As a leading commodities broker, our client relies entirely on their ability to trade, even in the event of a major catastrophe. Due to continued expansion, and limited additional power in their existing disaster recovery site, it was deemed necessary to move their back-up data centre.


British Polythene Industry

Whilst planning a major move from their Stockton HQ, British Polythene Industry, one of the world’s leading manufacturers of polythene products, decided to add resilience to their infrastructure by dividing their existing IT setup between two remote sites. The equipment to be moved included multiple IBM BladeCentres, 4800-series disk storage arrays and Cisco Catalysts contained Read more...